Threads / HS2 Project / On the basis of a report by the Comptroller and Auditor Gen…
Committee Material Published 22 Sep 2021 ↗ View on Parliament

On the basis of a report by the Comptroller and Auditor General, we took evidence from the Department for Transport (the Department) and High Speed Two Limited (HS2 Ltd) on the High Speed 2 programme.1 We also took evidence from the West Midlands Combined Authority, the National Infrastructure Commission and the Independent Construction Commissioner HS2 (the Commissioner).

On the basis of a report by the Comptroller and Auditor General, we took evidence from the Department for Transport (the Department) and High Speed Two Limited (HS2 Ltd) on the High Speed 2 programme.1 We also took evidence from the West Midlands Combined Authority, the National Infrastructure Commission and the Independent Construction Commissioner HS2 (the Commissioner). Type: conclusion | Number: 1 | Response status: under_consideration Government response: Based on a report by the National Audit Office, the Committee took evidence from the Independent Construction Commissioner, the National Infrastructure Commission and the West Midlands Combined Transport Authority on 21 June 2021, and the Department for Transport (the department) and High Speed Two