A general focus by Ofgem on ‘just in time’ network investment means that limited current network capacity can be a barrier to new connections. We recommend that the Government and Ofgem work together to encourage anticipatory investment where it is apparent that new demands on the system are likely. This should be done through clear direction based on the Centralised Strategic Network Plan, as well as through targeted market incentives and reform of the network price control review process.
A general focus by Ofgem on ‘just in time’ network investment means that limited current network capacity can be a barrier to new connections. We recommend that the Government and Ofgem work together to encourage anticipatory investment where it is apparent that new demands on the system are likely. This should be done through clear direction based on the Centralised Strategic Network Plan, as well as through targeted market incentives and reform of the network price control review process. Type: recommendation | Number: 25 | Paragraph: 99 | Response status: accepted Government response: As set out above, Ofgem is responsible for setting and reviewing the electricity network price control, however, the Government will continue to work with Ofgem to ensure this works as effectively as possible and is in line with our Clean Energy Superpower mission, including Clean Power by 2030. To