The Department strongly agreed, however, about how the balance between compliance and cost should be considered when delivering national infrastructure in the future.41 HS2 Ltd also recognised that it was a complex issue and a sensitive area, telling us that the structure needed local planning permission from Buckinghamshire Council which led to at least a four–year delay which was eventually resolved by the planning inspector.42
The Department strongly agreed, however, about how the balance between compliance and cost should be considered when delivering national infrastructure in the future.41 HS2 Ltd also recognised that it was a complex issue and a sensitive area, telling us that the structure needed local planning permission from Buckinghamshire Council which led to at least a four–year delay which was eventually resolved by the planning inspector.42 Type: conclusion | Number: 24 | Response status: not_addressed Government response: 4.1 The government agrees with the Committee’s recommendation. Target implementation date: Summer 2025 4.2 The department intends to provide the Committee with a preliminary response in its letter to the Committee before the Summer recess begins in July 2025. 4.3 The proposed measures in the Plannin