The Electricity Network Connections (Designated Strategic Plans) Regulations 2026
Under section 165A(1) of the Energy Act 2023 (“the 2023 Act”) the Independent System Operator and Planner (“ISOP”) must have regard to those plans or documents designated as strategic plans under section 165A(2) (“designated strategic plans”) when carrying out functions relating to network connections. The Secretary of State by notice designated the National Energy System Operator Limited as the ISOP with effect from 1st October 2024.
The Electricity Network Connections (Designated Strategic Plans) Regulations 2026
Skip to main content
Skip to navigation
legislation.gov.uk
https://www.nationalarchives.gov.uk
Cymraeg
Home
Explore our collections
Research tools
Help and guidance
What's new
About us
Search Legislation
The Electricity Network Connections (Designated Strategic Plans) Regulations 2026
You are here:
UK Statutory Instruments
2026 No. 223
Whole
Instrument
Table of Contents
Content
Explanatory Memorandum
More Resources
Previous
Next
Plain View
Print Options
What Version
Latest available (Revised)
Original (As made)
Opening Options
Open whole Instrument
More Resources
Original: King's Printer Version
View more
Status:
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
Statutory Instruments
2026 No. 223
ELECTRICITY
The Electricity Network Connections (Designated Strategic Plans) Regulations 2026
Made
4th March 2026
Laid before Parliament
9th March 2026
Coming into force
30th March 2026
The Secretary of State makes these Regulations in exercise of the powers conferred by section 165A(2) of the Energy Act 2023(
1
).
Citation, commencement and extent
1.
—(1) These Regulations may be cited as the Electricity Network Connections (Designated Strategic Plans) Regulations 2026 and come into force on 30th March 2026.
(2) These Regulations extend to England and Wales and Scotland.
Designated Plan
2.
The Clean Power 2030 Action Plan(
2
), published by the Department for Energy Security and Net Zero, is designated in accordance with section 165A(2) of the Energy Act 2023.
Michael Shanks
Minister for Energy
Department for Energy Security and Net Zero
4th March 2026
Explanatory Note
(This note is not part of the Regulations)
Under section 165A(1) of the Energy Act 2023 (“
the 2023 Act
”) the Independent System Operator and Planner (“
ISOP
”) must have regard to those plans or documents designated as strategic plans under section 165A(2) (“designated strategic plans”) when carrying out functions relating to network connections. The Secretary of State by notice designated the National Energy System Operator Limited as the ISOP with effect from 1st October 2024.
Under section 16(2A) of the Electricity Act
1989 (c. 29)
(the “
1989 Act
”) when deciding how to comply with their duties under that section, and in particular in deciding how to prioritise persons requiring a connection, electricity distributors must have regard to designated strategic plans.
Under section 17 of the 1989 Act, electricity distributors are exempt from the duty to connect where this would not be in accordance with the designated strategic plans.
Regulation 2 designates the Clean Power 2030 Action Plan as a designated strategic plan. The plan, which sets out a pathway to a clean power system by 2030, was published by the Department for Energy Security and Net Zero, and comprises a main report and three annexes.
The Clean Power 2030 Action Plan has been produced in digital form only, however alternative, accessible formats can be obtained from
alt.formats@energysecurity.gov.uk
.
A full impact assessment has not been produced for this instrument as no, or no significant, impact on the private, voluntary or business sectors is foreseen. An Explanatory Memorandum is published alongside these Regulations on
www.legislation.gov.uk
.
(
1
)
2023 c. 52
; section 165A was inserted by section 17 of the Planning and Infrastructure Act
2025 (c. 34)
.
(
2
)
The Clean Power 2030 Action Plan comprises four component parts: (1) Clean Power 2030 Action Plan: A new era of clean electricity - main report, and (2) Clean Power 2030 Action Plan: A new era of clean electricity – technical annex, both published on 13th December 2024; (3) Clean Power 2030 Action Plan: A new era of clean electricity – connections reform annex (updated April 2025), published on 7th April 2025, and (4) Clean Power 2030 Action Plan: A new era of clean electricity - assessment of the clean energy skills challenge - evidence annex, published on 13th December 2024 and updated on 25th March 2025 with an added Welsh translation. The Clean Power 2030 Action Plan can be obtained at
https://www.gov.uk/government/publications/clean-power-2030-action-plan
.
Previous
Next
Back to top
Options/Help
Print Options
Official printed copies
Order a copy of this legislation
buy now
Print
The Whole
Instrument
PDF
The Whole
Instrument
Web page
The Whole
Instrument
Legislation is available in different versions:
Latest Available (revised):
The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made):
The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Opening Options
Different options to open legislation in order to view more content on screen at once
Explanatory Memorandum
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
More Resources
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
the original print PDF of the as enacted version that was used for the print copy
lists of changes made by and/or affecting this legislation item
confers power and blanket amendment details
all formats of all associated documents
correction slips
links to related legislation and further information resources
More Resources
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
the original print PDF of the as made version that was used for the print copy
correction slips
Click 'View More' or select 'More Resources' tab for additional information including:
lists of changes made by and/or affecting this legislation item
confers power and blanket amendment details
all formats of all associated documents
links to related legislation and further information resources
The data on this page is available in the
alternative data formats
listed:
HTML5
alternative version
HTML snippet
alternative version
PDF
alternative version
XML
alternative version
Akoma Ntoso
alternative version
HTML RDFa
alternative version
RDF/XML
alternative version
New site design
Help
About us
Site map
Accessibility
Contact us
Privacy notice
Cookies
All content is available under the
Open Government Licence v3.0
except where
otherwise stated
. This site additionally contains content derived from EUR-Lex, reused under the terms of the
Commission Decision 2011/833/EU
on the reuse of documents from the EU institutions. For more information see the
EUR-Lex public statement on re-use
.
©
Crown and database right