Threads / HS2 Phase 2a Development / HS2 Phase 2b working draft Environmental Statement volume 4…
Impact Assessment Published 11 Oct 2018 High Speed Two (HS2) Limited ↗ View on GOV.UK

HS2 Phase 2b working draft Environmental Statement volume 4: off-route effects

Describes likely off-route works (where locations are known) and the approach to their assessment.

▤ Verbatim text from source document

These works are at an early stage of design and will be reported in full in the formal Environmental Statement to be submitted alongside the hybrid Bill.

Published as part of the HS2 Phase 2b working draft Environmental Statement.