Threads / Fuel Poverty Strategy Review / Design of the Energy Company Obligation (ECO4): CFP respons…
Policy Paper Published 4 Oct 2021 Committee on Fuel Poverty ↗ View on GOV.UK

Design of the Energy Company Obligation (ECO4): CFP response to the BEIS consultation

Response from the Committee on Fuel Poverty to proposed changes to the Energy Company Obligation (ECO) scheme for ECO4, due to begin in April 2022.

▤ Verbatim text from source document

This document constitutes the contribution from the Committee on Fuel Poverty (CFP) to the BEIS consultation, Design of the Energy Company Obligation ECO4: 2022-2026.