Threads / HS2 Phase 2a Development / Volume 2 MA01: Hough to Walley's Green
Impact Assessment Published 24 Jan 2022 High Speed Two (HS2) Limited ↗ View on GOV.UK

Volume 2 MA01: Hough to Walley's Green

Presents the likely significant effects of the construction and operation of High Speed Two Phase 2b Crewe – Manchester on the environment within MA01

Attachments
▤ Verbatim text from source document

Presents the likely significant effects of the construction and operation of High Speed Two Phase 2b Crewe – Manchester on the environment within MA01