Threads / HS2 Phase 2a Development / Transport Assessment Part 1 (TR-001-00000)
Impact Assessment Published 24 Jan 2022 High Speed Two (HS2) Limited ↗ View on GOV.UK

Transport Assessment Part 1 (TR-001-00000)

A report that presents the traffic and transport effects of the construction and operation of HS2 Phase 2b Crewe – Manchester.

Attachments
▤ Verbatim text from source document

A report that presents the traffic and transport effects of the construction and operation of HS2 Phase 2b Crewe – Manchester.