Threads / HS2 Phase 2a Development / Transport Assessment Part 4 and Annex A - Report 1 of 2 (TR…
Impact Assessment Published 24 Jan 2022 High Speed Two (HS2) Limited ↗ View on GOV.UK

Transport Assessment Part 4 and Annex A - Report 1 of 2 (TR-005-00000_Report 1)

This report presents the assessment of the potential impacts of High Speed Two, Phase 2b Crewe – Manchester in terms of route-wide and off-route impacts

▤ Verbatim text from source document

This report presents the assessment of the potential impacts of High Speed Two, Phase 2b Crewe – Manchester in terms of route-wide and off-route impacts