Threads / HS2 Phase 2a Development / HS2 Phase 2b (Crewe – Manchester) Environmental Impact
Impact Assessment Published 24 Jan 2022 High Speed Two (HS2) Limited ↗ View on GOV.UK

HS2 Phase 2b (Crewe – Manchester) Environmental Impact

This section includes the Phase 2b (Crewe – Manchester) environmental statement which was produced as part of the High Speed Rail (Crewe - Manchester) Bill.

▤ Verbatim text from source document

The Phase 2b (Crewe – Manchester) environmental statement includes more information, such as the likely environmental impacts along the route and measures to manage and reduce them.