Threads / HS2 Phase 2a Development / HS2 Phase 2b SES2 and AP2 ES Volume 5: Wider effects report
Impact Assessment Published 3 Jul 2023 High Speed Two (HS2) Limited ↗ View on GOV.UK

HS2 Phase 2b SES2 and AP2 ES Volume 5: Wider effects report

This report details the changes to the likely significant effects reported in SES2 and AP2 ES that may result if the scheme as built deviates from the centre line of the works within the limits of deviation, as permitted under parliamentary powers.

▤ Verbatim text from source document

This report details the changes to the likely significant effects reported in SES2 and AP2 ES that may result if the scheme as built deviates from the centre line of the works within the limits of deviation, as permitted under parliamentary powers.

This document has been published as part of the HS2 Phase 2b SES2 and AP2 ES for the route between Crewe and Manchester.